School main plant room following completion of Lord work

School main plant room before work
- A decarbonisation strategy to reduce energy usage.
- The decommission and removal of all legacy mechanical and electrical equipment within the plant rooms.
- Replacement of an outdated plant and heating and hot water systems with improved energy efficiency and reliability.
- Installation of hybrid systems using high efficiency, modulating, condensing gas fired boilers, coupled with a cascade of air source heat pumps.
- The installation included air source heat pumps (ASHP), condensing gas fired boilers, buffer storage vessels, DHW generators, swimming pool heat exchanger, pressurisation equipment, variable speed circulation pumps and hydraulic pipework.
- Installation of interconnecting pipework to provide a hybrid heating / hot water / swimming pool heating solution.
- Location of leaks to existing distribution pipework within the school and installation of new circuits complete with associated building works.
- Replacement / upgrade of heat emitters within the building.
- Electrical and controls installation works including: electrical wiring complete with local isolation and containment, BMS control systems with energy efficient control strategies, weather compensation and remote web access, gas safety circuit and detection system, plus full commissioning and software development.
- Water treatment, thermal insulation to pipework with aluminium metal clad finish.
- Changeover from temporary plant onto new installations with negligible down time.
- Full commissioning, demonstration, handover and operation / maintenance manuals.
“Working to the school’s requirements, we were pleased to deliver a project which was the typical of the high standard of retro-fitting project which Lord regularly delivers.
“The quality of the work produced demonstrates the evolution of renewable and hybrid solutions. We were pleased to introduce a system which modernises the heating and hot water system while benefitting the site from greater control of energy levels.
“We are reducing fossil fuel usage, particularly during the school’s summer months when consumption will be down 100 per cent on peak levels. We have been recognised with awards for our success on sustainability so it is pleasing to deliver another example of how we can make a practical difference to our customers’ future energy consumption without compromising on quality.”
Technical specification Main Plant Room 1 Three boilers, output 200kW each: Total 600kW Four air to water ASHP Units 45kW each: Total 180kW Total plant room output: 780kW Plant Room 2 – Pool Three boilers, output 120kW each: Total 360kW Two air to water ASHP Units 45kW each: Total 90kW Total plant room output: 450kW To find out how Lord Combustion Services can deliver your heating and hot water project, get in touch: https://www.lordcombustion.co.uk/contact/
School main plant room stripped by Lord Combustion Services